Mizu & Ki
Enquire now
Assetz Mizu & Ki — Filed Project RecordSheet 09 / 10 · FAQ's
Sheet 09 / 10 · FAQ's

Frequently asked questions

Twelve direct answers, each sourced to the Karnataka RERA and BDA approval record for Assetz Mizu & Ki.

Where exactly is Assetz Mizu & Ki located?

The project is at Survey Numbers 50/1, 50/3, 51/1, 51/2, 51/3, 51/4 and 51/5 on Hennur Main Road, Chikkagubbi Village, Bidarahalli Hobli, Bengaluru East Taluk, Bengaluru Urban, Karnataka 562149. The recorded coordinates are 13.079703, 77.659255.

What configurations are available?

Only 4 BHK. All 188 homes in the project are four-bedroom units, with carpet areas in the filed schedules ranging from 209.68 sq m to 231.70 sq m — approximately 2,257 to 2,494 sq ft — plus balcony and verandah areas of roughly 18.39 to 34.65 sq m.

What is the price of a home at Assetz Mizu & Ki?

No price has been announced. The project is RERA registered (PRM/KA/RERA/1251/446/PR/070826/008862) but the promoter has not released an official price list. The price sheet will be sent to registered enquirers on the day it is released.

Is the project RERA registered?

Yes, under PRM/KA/RERA/1251/446/PR/070826/008862. It also holds BDA plan approval dated 28 July 2026 under plan number BDA/NM/AS/AA-2/TAS-3/U/14/2026-27. Verify independently at rera.karnataka.gov.in.

How many blocks and floors does the project have?

Twelve blocks, each of four floors. Eleven blocks have a single basement level and Block 5 has two. Block sizes range from 8 homes to 40 homes.

How large is the land parcel?

34,499 sq m, approximately 8.53 acres, with a sanctioned FAR of 1.512 and a built-up area of 69,963 sq m. Open area is 22,389 sq m against 12,110 sq m covered.

When will the project be completed?

Construction is proposed to start on 1 September 2026 with proposed completion on 31 August 2030. These are the dates declared in the approval record, subject to the timeline registered with RERA.

How much parking is provided?

The project-level statement records 15 open and 295 covered bays. The block-wise tables sum to 300 bays; both figures appear in the source record as filed. Listed units generally carry one parking lot each.

Who is the builder?

APG Skywards Private Limited, CIN U70101KA2016PTC093454, part of the Assetz Property Group. Akshay Kishore Dewani is recorded as chief executive officer and Gurumurthy N as project head.

What amenities are planned?

A 1,718.217 sq m clubhouse, parks and tree planting across 3,473.79 sq m, outdoor sports at 928.44 sq m, indoor sports at 448.56 sq m, a 173 sq m swimming pool, a 121 sq m gymnasium, power backup and CCTV surveillance. Smart home automation and piped gas are not provided.

Is there any litigation on the land?

The record states no land litigation. Advocate search reports and the relinquishment deed are listed among the documents filed with the approval application, and a buyer's advocate should review them directly before any commitment.

How do I get the floor plans and price list?

Send your details through the enquiry form on this site. Official floor plans, the specification sheet and the price list will be sent as soon as the promoter releases them — nothing unofficial in the meantime.

How does Assetz Mizu & Ki compare to a high-rise tower on the same corridor?

It trades tower scale for lower density: twelve four-floor blocks instead of one or two tall towers, with between two and ten homes per floor depending on the block. That generally means less lift dependence and a smaller shared amenity crowd, in exchange for a smaller footprint of retail and services typically built into larger tower podiums.

Is Assetz Mizu & Ki the same as Assetz Soul & Soil?

No. Soul & Soil is a separate, earlier Assetz villament and row-house community on Survey Numbers 43 and 45 in the same village, Chikkagubbi. Assetz Mizu & Ki is a distinct project on Survey Numbers 50/1, 50/3 and 51/1–51/5, registered under its own RERA number, PRM/KA/RERA/1251/446/PR/070826/008862.

Call